Product Specification
Executive Standard: Q/HJSY 006-2022
Binder Technical Specification | |
Property | Value |
Appearance | Fluid powder |
Fineness: (250μm) (%) | ≥90.0 |
Moisture (%) | ≤12.0 |
Viscosity(mPa·s) | ≥100 |
pH | 7.0-9.0 |
Bulk Density (g/L) | 1000±300 |
Case share 1
The customer hopes to reduce the amount of bentonite added and increase the CCS to 295KG.(The case is for reference only)
Customer Bentonite Dosage | Jianjie Binder Dosage | Number of Falls From a 0.5m Height Without Breaking | CCS(KG) | |
Test-1 | 0.45%⬇ | 0% | 3 | 254 |
Test-2 | 0.35%⬇ | 0.05% | 4 | 275⬆ |
Test-3 | 0.25%⬇ | 0.11% | 6 | 312⬆ |
Case share 2
The customer's raw materials is maxed iron ore powder, the equipment is traveling grate rotary kiln,focus on drop strength,the customer hopes to reduce the amount of bentonite used and increase CCS and reduction of impurities.(The case is for reference only)
Customer Bentonite Dosage | Jianjie Binder Dosage | Number of Falls From a 0.5m Height Without Breaking | CCS(KG) | |
Test-1 | 0.8%⬇ | 0% | 5 | 275 |
Test-2 | 0.4%⬇ | 0.1% | 6 | 285⬆ |
Test-3 | 0.4% | 0.15% | 6 | 315⬆ |
Case share 3
The customer produces iron ore pellets that needs to go into the DRI furnace, there is no need to reduce the bentonite content. The demand is to increase CCS and Increase feed amount.(The case is for reference only)
Customer Bentonite Dosage | Jianjie Binder Dosage | Feed to Furance(Ton) | CCS(KG) | Std | |
Test-1 | 1.7% | -- | 700 | 249 | 62 |
Test-2 | 1.6% | 0.1% | 750⬆ | 270⬆ | 75⬆ |
Test-3 | 1.6% | 0.12% | 820⬆ | 260 | 70 |
Product Characteristics
Good Effect:
The forming rate of the prepared pellets reaches 98%, the green pellets are intact after being dropped more than 7 times at a height of 0.5m, the compressive strength of the dry pellets is more than 50N-100N and the compressive strength is more than 2500N after being roasted at 1200℃ for 25min.
High Economic Benefits:
The amount of bentonite added is reduced by 1.0%, the grade of pellets is increased by 0.6%, the blast furnace output is increased by 1.8% and the coke consumption is saved by 1.2%.
Comparison with Traditional Binder
Product Maintenance
Get Free Sample:
Service Process
Our Services
We specialize in delivering comprehensive, customized solutions tailored to our clients' unique requirements. Our services encompass production line design, equipment upgrades, and product parameter adjustments based on trial results, ensuring optimal performance and feasibility. Our team consists of experts with deep theoretical knowledge and extensive practical experience in binder engineering R&D, design, manufacturing, and technical support. We offer a full range of services, including technical consultation, scheme design, product fabrication, equipment sourcing, installation and commissioning, binder supply, production operations, and dedicated after-sales support. Additionally, we provide turnkey EPC (Engineering, Procurement, and Construction) services or phased EPC solutions, customized to meet our clients' specific requirements.
Our Factory
Jianjie Group invested 20 million USD to build a new composite material production base and an automated production line in Dazhou, Sichuan Province. The facility covers an area of more than 13,300 square meters and employs nearly 200 people. We have been focusing on the binder industry for 15 years, and our products are exported to more than 20 countries. With an annual production capacity of up to 300,000 MT, our production scale is among the top in the same industry in China. Our main products include iron ore organic binder, RHF dezincification de-dusting ash binder, dedusting ash briquettes binder, metallurgical furnace binder, drilling fluid filter loss reduction agent, coke powder binder, air-dried briquettes binder, carbon additive binder, and pre-gelatinized maize starch, among others.
FAQ
Our products have strong viscosity, high Qualification rate & anti-calcium properties, and are also environmentally friendly & cost-effective.
Yes, we can. Our binder can increase strength and viscosity. Customized products are also available according to your requirements.
One year.
The production time normally takes 3-5 working days. Delivery time usually takes 30-45 days by sea to your port.
Our terms of delivery are EXW, FOB , CFR, and CIF.
25KG per plastic woven bag or 1000KG per jumbo bag.
Phone